Offers typically within 8 minutes

Substation accommodation

Homes for the crews building and maintaining substations, power lines and interconnectors.

Get free quotes in minutes

How many people?
  • Offers in 8 minutes
  • 25% cheaper than Airbnb
  • Cheaper than hotels
  • Company invoicing
  • Free, no obligation
  • Real team on call

How it works

  1. 1

    Send your requirements

    Tell us the area, dates, crew size, vehicles and budget. It takes a couple of minutes, and it’s free.

  2. 2

    Hosts nearby send offers

    Hosts near the site see your request and reply with a place and a price.

  3. 3

    Compare your options

    See each offer’s photos and price side by side, and message hosts with any questions.

  4. 4

    Book your stay

    Accept the offer that suits your crew and book online. You’re not committed until you do.

Prefer to talk it through?

Our team can help you find the right place for your stay.

CallWhatsApp

Near the big grid projects

Working on substation and power line projects

The electricity grid is being rebuilt to carry power from offshore wind, nuclear and solar farms to where people live. National Grid’s Great Grid Upgrade is a series of 17 projects, from Yorkshire GREEN and Bramford to Twinstead, both under construction, to new lines such as Norwich to Tilbury and Grimsby to Walpole. In the north of Scotland, SSEN Transmission applied in 2025 for consent for new 400kV lines from Caithness to Beauly, Beauly to Peterhead and Kintore to Tealing, and the Eastern Green Links will carry power under the North Sea from Scotland to England. Interconnectors to Norway, Denmark, the Netherlands, Belgium, France, Germany and Ireland each have converter stations of their own.

Grid work comes in stages. Surveys and ground investigation come first, then access roads, compounds and foundations. Overhead line crews put up pylons and string the conductors, cable crews dig trenches, pull cable and joint it, and substation and converter station builds move from civils and steelwork to transformers, switchgear and HVDC equipment. Testing and commissioning follow, with planned outages to tie new kit into the live network. A new line or converter station takes years: Eastern Green Links 1 and 2, started in 2024 and 2025, are due in 2029. Once running, every site still needs maintenance and outage work for decades.

On site you’ll find overhead linesmen, cable jointers, HV fitters and testers, protection and control engineers, authorised persons, civils and groundworks gangs, crane and plant operators and commissioning engineers, many from specialist contractors who travel from job to job. Long days and week-on rotations are common, and outages bring short, busy spells with extra people on site.

Substations and converter stations sit where the grid needs them, not where the hotels are: at cable landfalls on the coast, on old power station sites, in the Fens and the Highlands. Line routes run for miles through farmland, so the work moves as it goes. Crews need homes for weeks or months close to the current section, with a bed each, a kitchen, somewhere to dry kit and room for the vans, and they need to add homes quickly when an outage brings in extra hands.

Where the work is

Grid and substation projects and where to stay

The big power line, substation and interconnector projects being built, planned and running, with the towns where crews stay for each.

  • Under construction

    Bramford to Twinstead

    Between Ipswich and Sudbury, Suffolk and Essex

    A new 400kV overhead line and underground cable with the new Twinstead Green substation, built by Balfour Beatty for National Grid.

    Stay in Ipswich, Sudbury, Halstead, Colchester

  • Under construction

    Yorkshire GREEN

    Around York and Monk Fryston, North Yorkshire

    New overhead lines and substation works at Overton, Monk Fryston and Osbaldwick, under construction since 2024.

    Stay in York, Knaresborough, Harrogate, Knottingley, Castleford, Leeds

  • Under construction

    Eastern Green Link 1

    Torness, East Lothian to Hawthorn Pit, County Durham

    A subsea HVDC link from Scotland to the North East, under construction since February 2025 and due in 2029.

    Stay in Seaham, Peterlee, Sunderland, Durham, Houghton le Spring, Prestonpans

  • Under construction

    Eastern Green Link 2

    Peterhead, Aberdeenshire to Drax, North Yorkshire

    A subsea HVDC link with converter stations at Sandford Bay and Drax, under construction since 2024 and due in 2029.

    Stay in Peterhead, Aberdeen, Goole, York, Knottingley

  • Under construction

    Hinkley Connection

    Bridgwater to Seabank, near Avonmouth

    A new 400kV line, partly on T-pylons, built to carry power from Hinkley Point C, with the old pylons coming down.

    Stay in Bridgwater, Burnham-on-Sea, Bristol, Taunton

  • Under construction

    NeuConnect

    Isle of Grain, Kent

    A 1.4GW interconnector to Germany with a new substation on the Isle of Grain, expected to run from 2028.

    Stay in Gillingham, Chatham, Rochester, Sheerness, Gravesend

  • Planned

    Norwich to Tilbury

    Norfolk, Suffolk and Essex

    National Grid’s planned 400kV line from Norwich Main through Bramford and Tendring to Tilbury; its examination closed in August 2026 and a government decision is awaited.

    Stay in Ipswich, Norwich, Colchester, Chelmsford, Witham, Braintree, Tilbury, Grays, Basildon, Harwich, Diss

  • Planned

    Eastern Green Link 3

    Peterhead to Anderby Creek, Lincolnshire, and on to West Norfolk

    A planned HVDC link with converter stations in Aberdeenshire and West Norfolk; the main contracts were signed in 2026.

    Stay in Peterhead, Aberdeen, Skegness, Chapel St Leonards, Mablethorpe, Wisbech, King's Lynn

  • Planned

    Eastern Green Link 4

    Fife to the Lincolnshire coast and on to Walpole, Norfolk

    A planned HVDC link landing at Kinghorn, with converter stations at Westfield in Fife and near Walpole; main construction is expected from 2028.

    Stay in Kirkcaldy, Glenrothes, Dunfermline, Skegness, Chapel St Leonards, Wisbech, King's Lynn

Show all 30 projects
  • Planned

    Sea Link

    Suffolk coast to Minster, near Ramsgate, Kent

    A 138km subsea link with converter stations in Suffolk and Kent, granted development consent in 2026.

    Stay in Saxmundham, Ramsgate, Broadstairs, Margate, Canterbury

  • Planned

    Grimsby to Walpole

    Grimsby to Walpole, near Wisbech

    A proposed 121km (75-mile) line from Grimsby down the Lincolnshire coast and Fens to Walpole in Norfolk, with new substations along the way.

    Stay in Grimsby, Cleethorpes, Skegness, Mablethorpe, Wisbech, King's Lynn

  • Planned

    North Humber to High Marnham

    North of the Humber to High Marnham, Nottinghamshire

    A proposed new 400kV line from the Hull area across the Humber to High Marnham.

    Stay in Hull, Beverley, Goole, Scunthorpe, Retford, Newark

  • Planned

    Brinsworth to High Marnham

    Rotherham, South Yorkshire to High Marnham, Nottinghamshire

    A planned upgrade of the existing high-voltage line between the Brinsworth and High Marnham substations.

    Stay in Rotherham, Sheffield, Worksop, Retford, Newark

  • Planned

    LionLink

    Walberswick, on the Suffolk coast

    A proposed link to the Netherlands and Dutch offshore wind, with Walberswick as its preferred landfall.

    Stay in Halesworth, Saxmundham, Lowestoft

  • Planned

    MaresConnect

    Bodelwyddan, Denbighshire

    A proposed interconnector to Ireland, planned to connect to the grid near Bodelwyddan.

    Stay in Rhyl, Colwyn Bay

  • Planned

    Spittal–Loch Buidhe–Beauly

    Caithness to Beauly, through Sutherland and Easter Ross

    SSEN Transmission’s proposed 400kV overhead line and new substations, submitted for consent in 2025.

    Stay in Inverness, Dingwall, Alness

  • Planned

    Beauly–Blackhillock–New Deer–Peterhead

    Beauly to Peterhead, through Moray and Aberdeenshire

    SSEN Transmission’s proposed 400kV overhead line, submitted for consent in 2025.

    Stay in Inverness, Huntly, Elgin/Urquhart, Buckie, Banff, Macduff, Peterhead

  • Planned

    Kintore–Tealing

    Kintore, Aberdeenshire to Tealing, near Dundee

    SSEN Transmission’s proposed 400kV overhead line, submitted for consent in 2025.

    Stay in Aberdeen, Dundee, Arbroath, Brechin

  • Operating

    Viking Link

    Bicker Fen, near Boston, Lincolnshire

    A 1.4GW interconnector to Denmark with its converter station at Bicker Fen, running since December 2023.

    Stay in Sleaford, Woodhall Spa, Mablethorpe, Skegness

  • Operating

    North Sea Link

    Cambois, near Blyth, Northumberland

    A 1.4GW interconnector to Norway with its converter station near Blyth, running since 2021.

    Stay in Blyth, Ashington, Bedlington, Cramlington, Newcastle upon Tyne

  • Operating

    IFA2

    Former Daedalus airfield, near Fareham, Hampshire

    A 1GW interconnector to France, running since 2021.

    Stay in Gosport, Portsmouth, Southampton, Eastleigh

  • Operating

    IFA (Interconnexion France–Angleterre)

    Sellindge, near Ashford, Kent

    The 2GW link to France, running since 1986, with its converter station at Sellindge.

    Stay in Folkestone, Canterbury

  • Operating

    ElecLink

    Folkestone, through the Channel Tunnel

    A 1GW interconnector to France that runs through the Channel Tunnel, running since 2022.

    Stay in Folkestone, Dover, Canterbury

  • Operating

    BritNed

    Isle of Grain, Kent

    A 1GW interconnector to the Netherlands, running since 2011.

    Stay in Gillingham, Chatham, Rochester, Sheerness, Gravesend

  • Operating

    Nemo Link

    Richborough, near Ramsgate, Kent

    A 1GW interconnector to Belgium, running since 2019.

    Stay in Ramsgate, Broadstairs, Margate, Canterbury

  • Operating

    Greenlink

    Pembroke, Pembrokeshire

    A 500MW interconnector to Ireland, in full operation since January 2025.

    Stay in Pembroke Dock, Haverfordwest, Tenby

  • Operating

    East–West Interconnector

    Shotton, Deeside, Flintshire

    A 500MW link to Ireland with its converter station at Shotton, running since 2012.

    Stay in Deeside, Chester, Ellesmere Port

  • Operating

    Western HVDC Link

    Hunterston, Ayrshire to Flintshire Bridge, Deeside

    A 2.2GW subsea link between Scotland and North Wales, running since 2019.

    Stay in West Kilbride, Largs, Ayr, Deeside, Chester, Ellesmere Port

  • Operating

    Beauly–Denny

    Beauly, near Inverness, to Denny, near Falkirk

    A 220km, 400kV line through the Highlands and Perthshire, energised in 2015.

    Stay in Inverness, Stirling, Dunblane, Falkirk, Aberfeldy, Dingwall

  • Operating

    Caithness–Moray HVDC link

    Spittal, Caithness to Blackhillock, near Keith

    An HVDC link under the Moray Firth to the Blackhillock substation, running since 2019.

    Stay in Huntly, Buckie, Elgin/Urquhart

How Nezt helps

  • Hotels near the site are full or miles away

    Send one free request with the area, your dates and headcount, and hosts with a home within 15 miles send offers, typically within 8 minutes.

  • The work moves along the route

    Book homes in the next town along as the work moves, and send a new request for each section of the line.

  • An outage brings in extra people

    Send another request for the extra headcount and book homes close to the ones you have. Requests are free, with no payment details needed.

  • The programme runs for months or years

    Stays of 60 nights or more can be paid monthly, and many hosts offer weekly or monthly discounts.

  • The company needs proper paperwork

    Every booking comes with an invoice in the company’s name, and a real team on the phone, WhatsApp and email can help arrange stays.

  • Vans, trailers and kit

    Each listing shows its parking. Message the host through Nezt before you book to check there’s space for your vans.

Why grid and substation crews book with Nezt

Room for the whole crew

Whole houses with a bed for everyone, plus kitchens and living space, so the crew can stay together.

Search places

One request, several offers

Tell us where the site or line section is, your dates and headcount. Local hosts reply with offers you can compare side by side.

Make a request

Near the projects

Homes near the substations, converter stations and new lines, from Suffolk and the Humber to Peterhead and the Highlands.

Explore destinations

Have a place near a substation or power line project?

List your home on Nezt and host the crews building and maintaining the grid, from a two-week outage to the length of a project.

List your property

Questions people ask

How do I book accommodation for a grid or substation crew?

Search by location and number of guests and book a listed place straight away, or send a free request with your dates, headcount, budget and where the site is. Hosts with a home within 15 miles send you offers. Many places are whole houses that sleep 6 or more, and for bigger crews you can book several places close together.

Can we add homes for an outage or as the crew grows?

Yes. Send another request whenever extra people are coming, and book homes close to the ones you already have. Each home has its own cancellation policy, shown before you book, so you can see how and when you can let one go.

Is there accommodation near the big grid projects?

Yes. There are places in Ipswich and Colchester for Bramford to Twinstead and Norwich to Tilbury, York for Yorkshire GREEN, Seaham and Sunderland for Eastern Green Link 1, Peterhead and Aberdeen for Eastern Green Links 2 and 3, Inverness for the Beauly lines, Grimsby and Skegness for Grimsby to Walpole, Ramsgate for Sea Link and Nemo Link, and Bridgwater for the Hinkley Connection.

Our work moves along a line route. Can we move with it?

Yes. Book stays in different towns as the work moves, or send a new request for each section. Hosts with a home within 15 miles of the area you choose send offers.

Can we stay for a programme that runs for years?

Yes. Stays run from a single night to many months, and you can keep booking as the programme goes on. Stays of 60 nights or more can be paid monthly, and many hosts offer weekly or monthly discounts.

Can my company get an invoice?

Yes. Companies get an invoice in the company’s name for each booking.

How quickly will we get offers?

Hosts typically send offers within 8 minutes. Your request stays open for 7 days and each offer lasts 48 hours. Sending a request is free, with no obligation and no payment details needed.

Do you arrange site access or security clearance?

No. Homes on Nezt are private homes from local hosts, and your company handles site access and clearance as usual. You can message hosts through Nezt about anything you need before you book.

Is there parking for vans?

Each listing shows its parking, so you can check before you book. If you need space for several vans or a trailer, message the host through Nezt to ask.

What if outage dates change?

Each place has its own cancellation policy, shown before you book. You can message the host through Nezt at any time to ask about changing your dates.

Destinations to explore